Progress wise Report Summary of NET Metering

TSSPDCL » Circle :
SL.NO Circle Total NET Meter
Registrations
Total NET Meter
Proposed Capacity
( in KW)
Technical Feasibility Issued
for No. of Registrations
Technical Feasibility Issued
for Total Proposed Capacity( in KW)
Registrations
Yet To be Released
Capacity Yet To be
Released
( in KW)
Released Released
Capacity ( in KW)
1 2 3=(7+9) 4=(8+10) 5 6 7 8 9 10
1 HYDERABAD CENTRAL 121 2091 118 1931 22 691 99 1400
2 HYDERABAD NORTH 493 7139.5 481 7025.5 118 3142 375 3997.5
3 HYDERABAD SOUTH 89 1935 85 1914 33 365 56 1570
4 MAHABOOBNAGAR 12 273.9 10 265.9 4 19 8 254.9
5 MEDAK 61 4472 49 4199 26 3020 35 1452
6 NALGONDA 36 1416 36 1416 7 272 29 1144
7 RANGA REDDY EAST 249 5540.5 236 5265.5 93 4182 156 1358.5
8 RANGA REDDY NORTH 215 6839.5 204 5727.5 80 4270 135 2569.5
9 RANGA REDDY SOUTH 216 6578.5 212 6445.5 37 2112 179 4466.5
10 SIDDIPET 7 228 6 225 3 108 4 120
11 TOTAL 1499 36513.9 1437 34414.9 423 18181 1076 18332.9